Whole-House Renovations in Riverside South

Rooms & Interiors · Riverside South

Whole-House Renovations in Riverside South

Several rooms or an entire house renovated under one contract, one schedule and one project lead.

  • Free On-Site Estimates
  • Permits Applied For
  • Fixed Written Scope
  • Ottawa & the Valley
613-703-1808

Free on-site estimate

Start With a Walk-Through

Rather talk? 613-703-1808

Riverside South, South Ottawa & the Rideau

Whole-House Renovations in Riverside South

Whole-house projects in Riverside South often follow a purchase: new owners of newer subdivision homes and townhouses who would rather renovate once than live through years of smaller jobs.

For a Riverside South whole-house project we finish design and permits before demolition, order long-lead items early and phase the work so trades follow each other without gaps.

Structural, mechanical and layout changes in Riverside South go through the City of Ottawa. We confirm which parts of your job need a permit, prepare or coordinate the drawings, submit the application and call in each inspection as the work reaches it.

To get started, call 613-703-1808 or send the form on this page with a short description and a few phone photos of your house and your plans for it. We will arrange a visit in Riverside South, measure, and send a written estimate that spells out the scope, the allowances, the permits and a realistic schedule.

How we approach whole-house renovations →

Riverside South houses

How whole-house renovations changes with the house in Riverside South

Subdivision homes built since 2000 in Riverside South

For newer Riverside South homes, a whole-house project is usually about finishes rather than systems: kitchen, bathrooms, flooring, lighting, built-ins and the basement, done as one contract.

Approvals in Riverside South

What whole-house renovations needs approved in Riverside South

Building permit

In Riverside South, the City of Ottawa reviews plans and issues building permits. Any wiring also needs an ESA permit, pulled by a licensed electrician. You will know which approvals your job requires before signing, and we schedule each inspection as the work gets to that stage.

Radon

Eastern Ontario is known for elevated radon in some homes, and finishing a basement means more time spent at the lowest level. A long-term radon test is inexpensive and simple. If levels are high, a sub-slab depressurization system is far easier to install before the floor and walls are finished.

Conservation authority

The Rideau Valley Conservation Authority (RVCA) regulates much of the land around Riverside South's rivers and creeks. On a lot near water, a floodplain, a wetland or an unstable slope, its permission comes first and the building permit follows. Looking up your lot on its regulation map is one of the first things we do.

Step by step

How a Riverside South project runs

Step 1

Walk-through

We visit, listen, measure and look at the house closely, including what is behind the walls where we can.

Step 2

Written estimate

Scope, allowances, permits and schedule on paper, so you know exactly what you are agreeing to.

Step 3

Build

Permits in hand, materials ordered, trades in sequence, and one project lead you can always reach.

Step 4

Hand-over

Final inspections, a walk-through together, and a list of anything left to finish, done promptly.

Neighbourhoods

Working across Riverside South

Riverside South and Findlay Creek are young communities on the city's southern edge, built mostly since the late 1990s, where many homeowners are now finishing basements and changing builder finishes they lived with for the first few years.

Riverside SouthFindlay CreekLeitrim

Close by

Also nearby

Questions

Questions about whole-house renovations in Riverside South

How do I get a whole-house renovations estimate in Riverside South?+

Use the form on this page or call 613-703-1808. Describe what you want to change and add a few photos if you can. We will set up a walk-through and send a written estimate for your Riverside South project.

What kinds of houses do you renovate in Riverside South?+

Every kind found here, which in Riverside South means subdivision homes built since 2000. A stone foundation, a Tarion warranty, a septic bed or a riverbank each changes the plan, which is why we design around the house you live in, not a standard package.

Will I need a conservation authority permit in Riverside South?+

Only for lots the Rideau Valley Conservation Authority (RVCA) regulates, which usually means land beside water, in a floodplain or wetland, or on a steep bank. We look your address up on its maps at the start, so any approval is underway before the building permit application goes in.

Is it worth upgrading insulation while we renovate?+

Usually. With walls open, insulating and air sealing costs far less than doing it later, and Ottawa winters make it pay off in comfort.

Can we live in the house during the work?+

Sometimes, for part of it, with the work phased and dust walls up. For a full gut, most people move out for the heaviest stretch. We will tell you honestly which applies.

Which parts of Riverside South do you cover?+

All of it, including Riverside South, Findlay Creek and Leitrim, as well as nearby Barrhaven, Manotick, Greely, Nepean and Richmond.

Free on-site estimates across Ottawa and the Ottawa Valley

Planning whole-house renovations in Riverside South?

Send a short description and a few photos. We will set up a walk-through and follow it with a written estimate, with no obligation.

No ObligationWritten EstimatePermits HandledOne Project Lead
CallFree Estimate