When estimates for the same project come back far apart, it is tempting to pick the lowest and move on. More often the gap means the contractors priced different jobs. Reading them side by side, line by line, is the only way to know.
Start With the Scope
A good estimate describes the work in enough detail that a stranger could tell what is being built: what is removed, what is built, which trades are involved and what is excluded. "Bathroom renovation" is not a scope. "Remove tub and surround, install sloped shower base with membrane, tile walls to ceiling, new vanity and toilet, new exhaust fan ducted outside" is.
Look at the Allowances
Many estimates carry allowances for items you have not chosen yet, such as tile, fixtures or cabinets. A low allowance makes the total look smaller but will be exceeded once you choose real products. Compare allowances to what you actually expect to buy.
Check the Permit Line
Ask which parts of the job need a permit and who is applying. Structural changes, additions, second units and new bathrooms generally do. An estimate that leaves permits out entirely, or suggests skipping them, is not cheaper. It moves the risk to you.
Ask About the Trades
In Ontario, wiring needs an ESA permit and a licensed electrician. Find out who will handle the electrical, plumbing and gas, and where those trades fall in the schedule.
Compare the Schedules
You should be able to see when work starts, how long each phase lasts, when inspections fall, and how long you will be without a kitchen or bathroom. Long-lead items such as cabinets, counters, windows and custom glass drive the timeline.
Read the Payment Terms
Payments should be tied to stages of completed work and written into the contract. Be cautious of large deposits requested long before anything is ordered or built.
Warning Signs
- No written scope or contract
- A total far below the others with no explanation
- Pressure to skip permits or pay in cash to avoid them
- No answer to who does the electrical and plumbing
- Allowances far below the finishes you have described
The Takeaway
The best estimate is the clearest one. When you understand exactly what is included, how it will be built and inspected, and when, comparing contractors becomes straightforward.

