A Kitchen Planned Before It Is Built

Most kitchens that disappoint were not built badly; they were planned too quickly. Before we price cabinets we want to know who cooks, where the groceries land, where people sit while dinner is made, and what has annoyed you about the current room for years. The layout comes out of those answers, whether that means keeping the footprint and fixing the storage or taking a wall down for an island.

A kitchen touches more trades than any other room: demolition, framing, plumbing, electrical, ductwork for the hood, drywall, cabinets, counters, tile, flooring and paint. We run them as one sequence so that inspections happen before walls close, counters are templated only once the cabinets are level, and you always know who to call.

Moving a wall, adding circuits or relocating the sink usually needs a permit, and in Ontario electrical work is done under an Electrical Safety Authority permit by a licensed contractor. Your estimate shows which of these apply, along with the lead times for cabinets and counters that drive the schedule.

Step by step

From walk-through to hand-over

Step 1

Walk-through

We visit, listen, measure and look at the house closely, including what is behind the walls where we can.

Step 2

Written estimate

Scope, allowances, permits and schedule on paper, so you know exactly what you are agreeing to.

Step 3

Build

Permits in hand, materials ordered, trades in sequence, and one project lead you can always reach.

Step 4

Hand-over

Final inspections, a walk-through together, and a list of anything left to finish, done promptly.

Questions

Questions about kitchen renovations

How long will I be without a kitchen?+

It depends mostly on whether walls, plumbing or wiring are moving and on cabinet and counter lead times. We order long-lead items before demolition so the room is out of service for as short a stretch as possible, and the estimate shows that window in writing.

Can the wall between my kitchen and dining room come out?+

Often it can. If it carries load, an engineer sizes a beam and posts, a permit covers the work, and the floor and ceiling are patched so the change looks original. We look at the wall during the first visit.

Do I need a permit to redo my kitchen?+

New cabinets and counters in the same layout usually do not need a building permit. Structural changes and relocated plumbing generally do, and new circuits need an ESA permit. We confirm with your municipality before work begins.

Do you help choose cabinets and finishes?+

Yes. We walk you through cabinet construction, counter materials, tile, flooring and lighting, and the estimate lists exactly what is included or how much is allowed for each item.

Often planned together with new flooring, drywall, trim and stair work and whole-house renovations.

Free on-site estimates across Ottawa and the Ottawa Valley

Let's look at your house together.

Send a short description and a few photos. We will set up a walk-through and follow it with a written estimate, with no obligation.

No ObligationWritten EstimatePermits HandledOne Project Lead
CallFree Estimate