Home Additions in Riverside South

More Living Space · Riverside South

Home Additions in Riverside South

Rear and side additions, second storeys and four-season rooms on footings built for deep frost.

  • Free On-Site Estimates
  • Permits Applied For
  • Fixed Written Scope
  • Ottawa & the Valley
613-703-1808

Free on-site estimate

Start With a Walk-Through

Rather talk? 613-703-1808

Riverside South, South Ottawa & the Rideau

Home Additions in Riverside South

In Riverside South, an addition is often the answer when a family loves the neighbourhood but has outgrown the house. With newer subdivision homes and townhouses, rear additions and second storeys are both common.

Every Riverside South addition starts with a zoning check and site review, then design, engineering and permits before excavation.

Addition permits in Riverside South go through the City of Ottawa. We confirm which parts of your job need a permit, prepare or coordinate the drawings, submit the application and call in each inspection as the work reaches it.

To get started, call 613-703-1808 or send the form on this page with a short description and a few phone photos of your house and the space you need. We will arrange a visit in Riverside South, measure, and send a written estimate that spells out the scope, the allowances, the permits and a realistic schedule.

How we approach home additions →

Riverside South houses

How home additions changes with the house in Riverside South

Subdivision homes built since 2000 in Riverside South

Newer Riverside South lots are tight, so additions tend to be modest: a sunroom, a covered porch or a small rear extension. We check zoning and any subdivision restrictions before design.

Approvals in Riverside South

What home additions needs approved in Riverside South

Building permit

In Riverside South, the City of Ottawa reviews plans and issues building permits. Any wiring also needs an ESA permit, pulled by a licensed electrician. You will know which approvals your job requires before signing, and we schedule each inspection as the work gets to that stage.

Sensitive marine clay

Parts of Riverside South sit on sensitive marine clay, often called Leda clay, which shrinks as it dries and can let foundations settle. New footings may need a geotechnical review, and the City of Ottawa has guidance on planting trees near foundations on these soils. We find out what is under your lot before footings are designed.

Conservation authority

The Rideau Valley Conservation Authority (RVCA) regulates much of the land around Riverside South's rivers and creeks. On a lot near water, a floodplain, a wetland or an unstable slope, its permission comes first and the building permit follows. Looking up your lot on its regulation map is one of the first things we do.

Step by step

How a Riverside South project runs

Step 1

Walk-through

We visit, listen, measure and look at the house closely, including what is behind the walls where we can.

Step 2

Written estimate

Scope, allowances, permits and schedule on paper, so you know exactly what you are agreeing to.

Step 3

Build

Permits in hand, materials ordered, trades in sequence, and one project lead you can always reach.

Step 4

Hand-over

Final inspections, a walk-through together, and a list of anything left to finish, done promptly.

Neighbourhoods

Working across Riverside South

Riverside South and Findlay Creek are young communities on the city's southern edge, built mostly since the late 1990s, where many homeowners are now finishing basements and changing builder finishes they lived with for the first few years.

Riverside SouthFindlay CreekLeitrim

Close by

Also nearby

Questions

Questions about home additions in Riverside South

How do I get a home additions estimate in Riverside South?+

Use the form on this page or call 613-703-1808. Describe what you want to change and add a few photos if you can. We will set up a walk-through and send a written estimate for your Riverside South project.

What kinds of houses do you renovate in Riverside South?+

Every kind found here, which in Riverside South means subdivision homes built since 2000. A stone foundation, a Tarion warranty, a septic bed or a riverbank each changes the plan, which is why we design around the house you live in, not a standard package.

Does Leda clay affect building in Riverside South?+

It can. Sensitive marine clay is found under parts of Riverside South and can allow foundations to settle when it dries out. For additions, coach houses and large decks we confirm the soil conditions and, where needed, have footings designed with a geotechnical review.

Will I need a conservation authority permit in Riverside South?+

Only for lots the Rideau Valley Conservation Authority (RVCA) regulates, which usually means land beside water, in a floodplain or wetland, or on a steep bank. We look your address up on its maps at the start, so any approval is underway before the building permit application goes in.

How long does an addition take?+

It depends on size and complexity. Design and permits come first, and construction is planned around the seasons so the foundation and closing-in happen in good weather where possible.

Can my bungalow get a second storey?+

Often, if an engineer confirms the foundation and walls can carry the load, sometimes with reinforcement. We start with that assessment.

Which parts of Riverside South do you cover?+

All of it, including Riverside South, Findlay Creek and Leitrim, as well as nearby Barrhaven, Manotick, Greely, Nepean and Richmond.

Free on-site estimates across Ottawa and the Ottawa Valley

Planning home additions in Riverside South?

Send a short description and a few photos. We will set up a walk-through and follow it with a written estimate, with no obligation.

No ObligationWritten EstimatePermits HandledOne Project Lead
CallFree Estimate