Basement Apartments in Riverside South

More Living Space · Riverside South

Basement Apartments in Riverside South

Self-contained secondary units built to the Building Code and Fire Code, with the separate entrance, egress and fire separation done right.

  • Free On-Site Estimates
  • Permits Applied For
  • Fixed Written Scope
  • Ottawa & the Valley
613-703-1808

Free on-site estimate

Start With a Walk-Through

Rather talk? 613-703-1808

Riverside South, South Ottawa & the Rideau

Basement Apartments in Riverside South

Second units are one of the most asked-about projects in Riverside South. With newer subdivision homes and townhouses, some basements are nearly ready for a unit and others need more work, so the first step is always a feasibility check.

We take Riverside South basement units from zoning review to final inspection: drawings, permits, entrance, fire separation, egress, kitchen and bathroom, and sign-off.

Secondary unit permits in Riverside South go through the City of Ottawa. We confirm which parts of your job need a permit, prepare or coordinate the drawings, submit the application and call in each inspection as the work reaches it.

To get started, call 613-703-1808 or send the form on this page with a short description and a few phone photos of your basement and your plans for a unit. We will arrange a visit in Riverside South, measure, and send a written estimate that spells out the scope, the allowances, the permits and a realistic schedule.

How we approach basement apartments →

Riverside South houses

How basement apartments changes with the house in Riverside South

Subdivision homes built since 2000 in Riverside South

Newer Riverside South homes with a bathroom rough-in and good ceiling height make strong candidates for a unit. A builder-installed side door saves a lot of work, and engineered joists overhead need a fire separation designed for that floor system.

Approvals in Riverside South

What basement apartments needs approved in Riverside South

Building permit

In Riverside South, the City of Ottawa reviews plans and issues building permits. Any wiring also needs an ESA permit, pulled by a licensed electrician. You will know which approvals your job requires before signing, and we schedule each inspection as the work gets to that stage.

Additional dwelling units

Ontario's More Homes Built Faster Act (2022) allows up to three homes on most serviced urban lots that hold a house, semi or townhouse, and a detached unit can be one of them. It also caps the parking municipalities may demand. Local zoning details come from the City of Ottawa, and each unit is permitted and inspected against both the Building Code and the Fire Code.

Radon

Eastern Ontario is known for elevated radon in some homes, and finishing a basement means more time spent at the lowest level. A long-term radon test is inexpensive and simple. If levels are high, a sub-slab depressurization system is far easier to install before the floor and walls are finished.

Step by step

How a Riverside South project runs

Step 1

Walk-through

We visit, listen, measure and look at the house closely, including what is behind the walls where we can.

Step 2

Written estimate

Scope, allowances, permits and schedule on paper, so you know exactly what you are agreeing to.

Step 3

Build

Permits in hand, materials ordered, trades in sequence, and one project lead you can always reach.

Step 4

Hand-over

Final inspections, a walk-through together, and a list of anything left to finish, done promptly.

Neighbourhoods

Working across Riverside South

Riverside South and Findlay Creek are young communities on the city's southern edge, built mostly since the late 1990s, where many homeowners are now finishing basements and changing builder finishes they lived with for the first few years.

Riverside SouthFindlay CreekLeitrim

Close by

Also nearby

Questions

Questions about basement apartments in Riverside South

How do I get a basement apartments estimate in Riverside South?+

Use the form on this page or call 613-703-1808. Describe what you want to change and add a few photos if you can. We will set up a walk-through and send a written estimate for your Riverside South project.

What kinds of houses do you renovate in Riverside South?+

Every kind found here, which in Riverside South means subdivision homes built since 2000. A stone foundation, a Tarion warranty, a septic bed or a riverbank each changes the plan, which is why we design around the house you live in, not a standard package.

Do I need separate utilities?+

Not necessarily, but separate heating or protected ductwork is often required for fire safety, and separate metering can make renting simpler.

Can my house have a basement apartment?+

Many can. Ontario allows additional units on most serviced urban lots with a house, semi or townhouse, and your municipality sets the details. We review your property before you commit.

Which parts of Riverside South do you cover?+

All of it, including Riverside South, Findlay Creek and Leitrim, as well as nearby Barrhaven, Manotick, Greely, Nepean and Richmond.

Free on-site estimates across Ottawa and the Ottawa Valley

Planning basement apartments in Riverside South?

Send a short description and a few photos. We will set up a walk-through and follow it with a written estimate, with no obligation.

No ObligationWritten EstimatePermits HandledOne Project Lead
CallFree Estimate