Home Additions in Nepean

More Living Space · Nepean

Home Additions in Nepean

Rear and side additions, second storeys and four-season rooms on footings built for deep frost.

  • Free On-Site Estimates
  • Permits Applied For
  • Fixed Written Scope
  • Ottawa & the Valley
613-703-1808

Free on-site estimate

Start With a Walk-Through

Rather talk? 613-703-1808

Nepean, Inside the Greenbelt

Home Additions in Nepean

From Centrepointe and Bells Corners to the rest of Nepean, we build additions that match the house in materials, roof lines and proportions.

Every Nepean addition starts with a zoning check and site review, then design, engineering and permits before excavation.

Addition permits in Nepean go through the City of Ottawa. We confirm which parts of your job need a permit, prepare or coordinate the drawings, submit the application and call in each inspection as the work reaches it.

To get started, call 613-703-1808 or send the form on this page with a short description and a few phone photos of your house and the space you need. We will arrange a visit in Nepean, measure, and send a written estimate that spells out the scope, the allowances, the permits and a realistic schedule.

How we approach home additions →

Nepean houses

How home additions changes with the house in Nepean

Wartime and post-war houses in Nepean

Wartime and post-war Nepean houses are small on decent lots, which makes them good candidates for a rear addition or a full second storey. Going up needs an engineer to confirm the foundation and walls can carry it, and many can with some reinforcement.

1960s to 1990s bungalows, splits and two-storeys in Nepean

In Nepean's 1960s to 1990s neighbourhoods the usual additions are a bigger kitchen and family room at the back, a main-floor primary suite or a four-season sunroom. Zoning setbacks and lot coverage set the limits.

Approvals in Nepean

What home additions needs approved in Nepean

Building permit

In Nepean, the City of Ottawa reviews plans and issues building permits. Any wiring also needs an ESA permit, pulled by a licensed electrician. You will know which approvals your job requires before signing, and we schedule each inspection as the work gets to that stage.

Conservation authority

The Rideau Valley Conservation Authority (RVCA) regulates much of the land around Nepean's rivers and creeks. On a lot near water, a floodplain, a wetland or an unstable slope, its permission comes first and the building permit follows. Looking up your lot on its regulation map is one of the first things we do.

Testing before demolition

Asbestos turns up in older plaster, stipple ceilings, vinyl tile, vermiculite and pipe insulation, and lead in old paint. Where a Nepean house is old enough to contain either, samples go to a lab before demolition, and anything that tests positive is removed under Ontario's asbestos and lead rules.

Step by step

How a Nepean project runs

Step 1

Walk-through

We visit, listen, measure and look at the house closely, including what is behind the walls where we can.

Step 2

Written estimate

Scope, allowances, permits and schedule on paper, so you know exactly what you are agreeing to.

Step 3

Build

Permits in hand, materials ordered, trades in sequence, and one project lead you can always reach.

Step 4

Hand-over

Final inspections, a walk-through together, and a list of anything left to finish, done promptly.

Neighbourhoods

Working across Nepean

Nepean was a city of its own until 2001, and most of its housing went up between the 1950s and the 1980s: brick bungalows and side-splits in Crestview and Copeland Park, family two-storeys in Centrepointe and Craig Henry, and townhouse communities throughout.

CentrepointeBells CornersCraig HenryQualicumCrestviewMeadowlandsCopeland ParkBriargreen

Close by

Also nearby

Questions

Questions about home additions in Nepean

How do I get a home additions estimate in Nepean?+

Use the form on this page or call 613-703-1808. Describe what you want to change and add a few photos if you can. We will set up a walk-through and send a written estimate for your Nepean project.

What kinds of houses do you renovate in Nepean?+

Every kind found here, which in Nepean means wartime and post-war houses and 1960s to 1990s bungalows, splits and two-storeys. A stone foundation, a Tarion warranty, a septic bed or a riverbank each changes the plan, which is why we design around the house you live in, not a standard package.

Will I need a conservation authority permit in Nepean?+

Only for lots the Rideau Valley Conservation Authority (RVCA) regulates, which usually means land beside water, in a floodplain or wetland, or on a steep bank. We look your address up on its maps at the start, so any approval is underway before the building permit application goes in.

How do you avoid ice dams where the addition meets the house?+

By designing the roof tie-in carefully, insulating and air sealing the ceiling well, and ventilating the roof so snow does not melt and refreeze at the eaves.

How long does an addition take?+

It depends on size and complexity. Design and permits come first, and construction is planned around the seasons so the foundation and closing-in happen in good weather where possible.

Which parts of Nepean do you cover?+

All of it, including Centrepointe, Bells Corners, Craig Henry, Qualicum, Crestview, Meadowlands, Copeland Park and Briargreen, as well as nearby Barrhaven, Ottawa, Riverside South, Kanata and Gloucester.

Free on-site estimates across Ottawa and the Ottawa Valley

Planning home additions in Nepean?

Send a short description and a few photos. We will set up a walk-through and follow it with a written estimate, with no obligation.

No ObligationWritten EstimatePermits HandledOne Project Lead
CallFree Estimate