
More Living Space · Nepean
Decks & Porches in Nepean
Decks, covered porches, railings and stairs in treated wood, cedar or composite, set on footings below the frost line.
- Free On-Site Estimates
- Permits Applied For
- Fixed Written Scope
- Ottawa & the Valley
Nepean, Inside the Greenbelt
Decks and Porches in Nepean
Across Nepean, we build new decks, replace tired ones and rebuild porches, from Centrepointe and Bells Corners to the rest of the area.
Every Nepean deck we build sits on footings below the frost line, with structure and railings built to the Building Code.
To get started, call 613-703-1808 or send the form on this page with a short description and a few phone photos of your yard and the deck or porch you want. We will arrange a visit in Nepean, measure, and send a written estimate that spells out the scope, the allowances, the permits and a realistic schedule.
How we approach decks & porches →Nepean houses
How decks & porches changes with the house in Nepean
Wartime and post-war houses in Nepean
Wartime and post-war Nepean houses often have a few concrete steps at the back door and a big yard. A low deck with wide stairs turns the yard into an extra room for the summer.
1960s to 1990s bungalows, splits and two-storeys in Nepean
Many Nepean decks from the 1980s and 1990s are pressure-treated wood near the end of its life, with railings that no longer meet the Building Code. We check the ledger, joists and footings and tell you honestly whether it is a resurface or a rebuild.
Approvals in Nepean
What decks & porches needs approved in Nepean
Building permit
In Nepean, the City of Ottawa reviews plans and issues building permits. Any wiring also needs an ESA permit, pulled by a licensed electrician. You will know which approvals your job requires before signing, and we schedule each inspection as the work gets to that stage.
Conservation authority
The Rideau Valley Conservation Authority (RVCA) regulates much of the land around Nepean's rivers and creeks. On a lot near water, a floodplain, a wetland or an unstable slope, its permission comes first and the building permit follows. Looking up your lot on its regulation map is one of the first things we do.
Testing before demolition
Asbestos turns up in older plaster, stipple ceilings, vinyl tile, vermiculite and pipe insulation, and lead in old paint. Where a Nepean house is old enough to contain either, samples go to a lab before demolition, and anything that tests positive is removed under Ontario's asbestos and lead rules.
Step by step
How a Nepean project runs
Step 1
Walk-through
We visit, listen, measure and look at the house closely, including what is behind the walls where we can.
Step 2
Written estimate
Scope, allowances, permits and schedule on paper, so you know exactly what you are agreeing to.
Step 3
Build
Permits in hand, materials ordered, trades in sequence, and one project lead you can always reach.
Step 4
Hand-over
Final inspections, a walk-through together, and a list of anything left to finish, done promptly.
Neighbourhoods
Working across Nepean
Nepean was a city of its own until 2001, and most of its housing went up between the 1950s and the 1980s: brick bungalows and side-splits in Crestview and Copeland Park, family two-storeys in Centrepointe and Craig Henry, and townhouse communities throughout.
Questions
Questions about decks & porches in Nepean
How do I get a decks & porches estimate in Nepean?+
Use the form on this page or call 613-703-1808. Describe what you want to change and add a few photos if you can. We will set up a walk-through and send a written estimate for your Nepean project.
What kinds of houses do you renovate in Nepean?+
Every kind found here, which in Nepean means wartime and post-war houses and 1960s to 1990s bungalows, splits and two-storeys. A stone foundation, a Tarion warranty, a septic bed or a riverbank each changes the plan, which is why we design around the house you live in, not a standard package.
Will I need a conservation authority permit in Nepean?+
Only for lots the Rideau Valley Conservation Authority (RVCA) regulates, which usually means land beside water, in a floodplain or wetland, or on a steep bank. We look your address up on its maps at the start, so any approval is underway before the building permit application goes in.
Why does my old deck heave every spring?+
Usually because the footings are too shallow or bear on soil that freezes. New footings below the frost line solve it.
Composite or wood?+
Composite needs less upkeep and lasts longer; wood costs less up front and can be refinished. We show you both.
Which parts of Nepean do you cover?+
All of it, including Centrepointe, Bells Corners, Craig Henry, Qualicum, Crestview, Meadowlands, Copeland Park and Briargreen, as well as nearby Barrhaven, Ottawa, Riverside South, Kanata and Gloucester.
Related work in Nepean
Projects like this often go hand in hand with home additions, basement renovations and whole-house renovations in Nepean, which can be planned together to save time.
More more living space in Nepean: basement renovations, basement apartments, coach houses & garden suites and home additions.
Free on-site estimates across Ottawa and the Ottawa Valley
Planning decks & porches in Nepean?
Send a short description and a few photos. We will set up a walk-through and follow it with a written estimate, with no obligation.
