
Rooms & Interiors · Smiths Falls
Flooring in Smiths Falls
Hardwood, engineered plank, vinyl and tile laid over a levelled subfloor, with acclimatization planned for our dry winters.
- Free On-Site Estimates
- Permits Applied For
- Fixed Written Scope
- Ottawa & the Valley
Smiths Falls, Lanark & the Ottawa Valley
Flooring in Smiths Falls
From Downtown Smiths Falls and Rideau Canal to the rest of Smiths Falls, we replace carpet, refinish original hardwood and lay new floors that run cleanly from room to room.
Every Smiths Falls flooring job starts with the subfloor: we level, fasten and quiet it before the new floor goes down, so it stays flat after the first heating season.
To get started, call 613-703-1808 or send the form on this page with a short description and a few phone photos of your floors. We will arrange a visit in Smiths Falls, measure, and send a written estimate that spells out the scope, the allowances, the permits and a realistic schedule.
How we approach flooring →Smiths Falls houses
How flooring changes with the house in Smiths Falls
Victorian, Edwardian and stone homes in Smiths Falls
Many older Smiths Falls homes still have pine or oak floors under carpet or linoleum. Where they can be saved we repair and refinish them. Old floor tile and its adhesive are tested for asbestos before anything is lifted.
Wartime and post-war houses in Smiths Falls
Wartime and post-war houses in Smiths Falls usually have narrow-strip oak upstairs and patched-over kitchens and halls. Levelling the transitions lets one floor run through the whole main level.
Riverfront and waterfront homes in Smiths Falls
On waterfront properties near Smiths Falls we check moisture in the subfloor and slab first. Vinyl plank and tile are the safer choices close to the water and below grade.
Approvals in Smiths Falls
What flooring needs approved in Smiths Falls
Building permit
In Smiths Falls, the Town of Smiths Falls reviews plans and issues building permits. Any wiring also needs an ESA permit, pulled by a licensed electrician. You will know which approvals your job requires before signing, and we schedule each inspection as the work gets to that stage.
Conservation authority
The Rideau Valley Conservation Authority (RVCA) regulates much of the land around Smiths Falls's rivers and creeks. On a lot near water, a floodplain, a wetland or an unstable slope, its permission comes first and the building permit follows. Looking up your lot on its regulation map is one of the first things we do.
Testing before demolition
Asbestos turns up in older plaster, stipple ceilings, vinyl tile, vermiculite and pipe insulation, and lead in old paint. Where a Smiths Falls house is old enough to contain either, samples go to a lab before demolition, and anything that tests positive is removed under Ontario's asbestos and lead rules.
Step by step
How a Smiths Falls project runs
Step 1
Walk-through
We visit, listen, measure and look at the house closely, including what is behind the walls where we can.
Step 2
Written estimate
Scope, allowances, permits and schedule on paper, so you know exactly what you are agreeing to.
Step 3
Build
Permits in hand, materials ordered, trades in sequence, and one project lead you can always reach.
Step 4
Hand-over
Final inspections, a walk-through together, and a list of anything left to finish, done promptly.
Neighbourhoods
Working across Smiths Falls
Smiths Falls grew up around the Rideau Canal locks and the railway, with older brick homes in the centre of town, post-war neighbourhoods around them and rural and waterfront properties toward Rideau Ferry.
Questions
Questions about flooring in Smiths Falls
How do I get a flooring estimate in Smiths Falls?+
Use the form on this page or call 613-703-1808. Describe what you want to change and add a few photos if you can. We will set up a walk-through and send a written estimate for your Smiths Falls project.
What kinds of houses do you renovate in Smiths Falls?+
Every kind found here, which in Smiths Falls means victorian, edwardian and stone homes, wartime and post-war houses and riverfront and waterfront homes. A stone foundation, a Tarion warranty, a septic bed or a riverbank each changes the plan, which is why we design around the house you live in, not a standard package.
Will I need a conservation authority permit in Smiths Falls?+
Only for lots the Rideau Valley Conservation Authority (RVCA) regulates, which usually means land beside water, in a floodplain or wetland, or on a steep bank. We look your address up on its maps at the start, so any approval is underway before the building permit application goes in.
Can you match my existing hardwood?+
Often closely, by matching species and width and refinishing the whole area so old and new take the same stain.
Which flooring works best in a basement?+
Products that tolerate moisture: luxury vinyl plank, tile, or some engineered products over a proper underlay. Solid hardwood is a poor fit below grade.
Which parts of Smiths Falls do you cover?+
All of it, including Downtown Smiths Falls, Rideau Canal, Montague and Rideau Ferry, as well as nearby Merrickville, Perth, Carleton Place, Kemptville and Richmond.
Related work in Smiths Falls
Projects like this often go hand in hand with drywall, trim and stair work, kitchen renovations and basement renovations in Smiths Falls, which can be planned together to save time.
More rooms & interiors in Smiths Falls: kitchen renovations, bathroom renovations, aging-in-place renovations, drywall, trim & stairs, whole-house renovations and commercial renovations.
Free on-site estimates across Ottawa and the Ottawa Valley
Planning flooring in Smiths Falls?
Send a short description and a few photos. We will set up a walk-through and follow it with a written estimate, with no obligation.
